Installing sheetrock over foam insulation |
The construction schedule is really picking up pace and things will come together quickly now.
-
Apartment kitchen - Next week tape, top, texture the walls
- 2 weeks out install trim
- 3 weeks out paint
- 4 weeks out install cabinets
Wow. Now that the walls are built the rooms have taken on a completely different look and feel than when the walls were just studs. There are still many decisions to make in a very short period of time, including colors. Choosing colors has always been a challenge for me and may cause more than a little stress. there are sample colors on the exterior but narrowing down the options from the top three to the perfect color can take a long time in our house.